25–29 May 2026
La Biodola - Isola d'Elba (Italy)
Europe/Rome timezone
Reminder: Posters are requested to be uploaded by Thursday, 21 May.

Design of the Global Timing Unit (GTU) for ePIC

26 May 2026, 11:25
1h 5m
Elena Room (Hotel Hermitage)

Elena Room

Hotel Hermitage

Poster presentation Data Acquisition and Trigger Architectures Data Acquisition and Trigger Architectures - PS

Speaker

William Gu (Jefferson Lab)

Description

The design of the Global Timing Unit (GTU) for the experiment ePIC at the EIC is described. The ePIC system clock distribution test results are shown using the recently produced GTU engineering article, which includes the GTU base board and the Optic Transceiver Plugin Modules. The Multi-Gigabit link between the GTU and the DAM (ePIC run control command and the DAQ status) is tested. (If the testing time permits and the logistics are available, the ePIC system clock recovered on the DAM/FLX152 and the TOF RDO will be shown. If the testing time permits, the concept of multiple ePIC run control user interfaces will be shown).

Minioral Yes
IEEE Member No
Are you a student? No

Author

William Gu (Jefferson Lab)

Presentation materials

There are no materials yet.