5–10 Jun 2016
Padova, Italy
Europe/Rome timezone

Session

CMTS

TRIG
8 Jun 2016, 10:20
Padova, Italy

Padova, Italy

<a href="https://goo.gl/maps/vWFxL">Centro Congressi A. Luciani Via Forcellini, 170/A Padova ITALY</a>

Conveners

CMTS

  • Alex Gong (Tsinghua University (CN))
  • Zhen-An Liu (IHEP,Chinese Academy of Sciences (CN))

Presentation materials

There are no materials yet.

  1. Diogo Miguel Louro Alves (CERN)
    08/06/2016, 10:20
    Control, Monitoring,Test and Real Time Diagnostics Systems
    Oral presentation
    The system for the beam-based feedbacks in the LHC is one of the most complex in CERN’s accelerator complex. It is an essential system for the operation of the LHC and is routinely used to simultaneously control the beam orbit, machine tune, and radial-loop adjusting the beam energy. The system handles the input of over 2'000 measurements, and controls the current in over 1'000 superconducting...
    Go to contribution page
  2. Alberto Aloisio (Universita e INFN, Napoli (IT))
    08/06/2016, 10:40
    Control, Monitoring,Test and Real Time Diagnostics Systems
    Oral presentation
    We present a Service-Oriented Platform (uSOP) designed for deep embedded applications in controls and monitoring of detectors, sensors as well as complex research instruments. uSOP is a single board computer based on the AM3358 1 GHz ARM Cortex A8 processor and it is equipped with standard uSD, USB and Ethernet interfaces. On board RAM and solid state storage allows hosting a full LINUX...
    Go to contribution page
  3. Martin Brückner (Paul Scherrer Institut)
    08/06/2016, 11:00
    Real Time System Architectures and Intelligent Signal Processing
    Oral presentation
    Eiger is a single-photon counting x-ray pixel detector developed at the Paul Scherrer Institute for energies up to 25 keV with a pixel size of 75$\times$75 µm$^2$. The Eiger detector is designed for synchroton applications and consists of several modules each having a total of 500 kpixels. 1.5 Mpixel and 2 Mpixel detectors (3 and 4 modules) are being integrated in several beamlines and a 9...
    Go to contribution page
Building timetable...