Speakers
Alex Jones
(STFC-UKRI)Mr
Harry Byrne
Description
A site agnostic approach to installation of the Time Projection Chamber (TPC) into its final position within the XLZD detector - looking at different potential options for the detector design to simplify assembly staging and enable TPC maintenance access. Many of the options presented will have impacts on detector design requirements but should all hold a solution to the problem of gaining full access to the TPC without de-cabling the top and bottom PMT arrays.
Authors
Alex Jones
(STFC-UKRI)
Mr
Harry Byrne