Speaker
Alex Jones
(STFC-UKRI)
Description
An overview of the existing XLZD@Boulby schedule and how it might be adjusted to suit a site agnostic installation timeline in advance of the XLZD Concept Design Review (CDR). The current schedule covers key components from the Work Breakdown Structure (WBS) from completion of the XLZD CDR through to commissioning of the XLZD detector, identifying potential critical paths, and estimating lead times for each component.
Author
Alex Jones
(STFC-UKRI)