Speaker
Harry Byrne
(STFC - RAL)
Description
TPC maintenance may be a large driver for the design of several systems within the experiment. As with all engineering endevours, there is an ideal to aim for when pursuing simple and easy maintenance of a given assembly. XLZD poses quite the challenge for easy access to the full TPC for major maintenance, e.g. 40 t to 80 t detector upgrade. This poster will lay out some of the major challenges posed and possible solutions.
Author
Harry Byrne
(STFC - RAL)