Skip to main content
3–7 Jun 2019
ITER Headquarters (B72)
Europe/Paris timezone

High Energy Photon Source Controls Status Report

4 Jun 2019, 11:00
20m
Cosylab Arena (ITER Headquarters (B72))

Cosylab Arena

ITER Headquarters (B72)

ITER Organization Route de Vinon-sur-Verdon 13067 St. Paul-lez-Durance (France)
Talk Project Status Reports Project Status Reports

Speaker

C. M. P. Chu (Institute of High Energy Physics, Chinese Academy of Sciences)

Description

An ultra-low emittance, 6-GeV high energy synchrotron radiation light source which contains a linac, a booster, a 1360-m circumference storage ring, and fifteen beamlines in phase one will be built in suburban Beijing. The number of devices and complexity level for the new machine is extremely large which requires a modern control system design for smooth operation. The preliminary control system design will be presented. New development for high-level software and databases is described. Possible EPICS related development is planned.

Author

C. M. P. Chu (Institute of High Energy Physics, Chinese Academy of Sciences)

Presentation materials