3–7 Jun 2019
ITER Headquarters (B72)
Europe/Paris timezone

Session

Services

P-SRVCS
5 Jun 2019, 16:50
Cosylab Arena (ITER Headquarters (B72))

Cosylab Arena

ITER Headquarters (B72)

ITER Organization Route de Vinon-sur-Verdon 13067 St. Paul-lez-Durance (France)

Conveners

Services

  • Gillian Black (Canadian Light Source Inc.)

Description

Archive, alarm, log and similar services

Presentation materials

There are no materials yet.

  1. Mrs Katy Saintin (IRFU1, CEA, Université Paris-Saclay, F-91919 Gif-sur-Yvette, France)
    05/06/2019, 16:50
    Services
    Talk

    IRFU[1] software control team (LDISC) is involved from feasibility studies to equipment deployment into many different experiments by their size and running time. For many years, LDISC is using PLC solution for controlling part of the experiment, and two different SCADA:

    • MUSCADE, in-house SCADA dedicated to small experiments.
    • EPICS for big facilities.

    With MUSCADE, LDISC has...

    Go to contribution page
  2. Kay-Uwe Kasemir
    05/06/2019, 17:10
    Services
    Talk

    When porting the RCP-based CS-Studio alarm system tools to phoebus, its architecture which used to be based on a combination of RDB and JMS was reconsidered. The new implementation based on Kafka offers several advantages.

    Go to contribution page
  3. Kunal Shroff (Brookhaven National Lab)
    05/06/2019, 17:30
    Services
    Talk

    An effective and useful alarm system is one which produces alarms which are well defined both in terms of its causes and the corrective actions to be taken at the same time it avoids overwhelming the user with noisy and numerous alarms. To achieve these goals it is imperative to ensure that the alarm configuration is properly populated, tuned, and maintained.

    The new phoebus alarm system...

    Go to contribution page
Building timetable...