3–7 Jun 2019
ITER Headquarters (B72)
Europe/Paris timezone

Session

Core Developments

P-CORE
6 Jun 2019, 14:30
Cosylab Arena (ITER Headquarters (B72))

Cosylab Arena

ITER Headquarters (B72)

ITER Organization Route de Vinon-sur-Verdon 13067 St. Paul-lez-Durance (France)

Conveners

Core Developments

  • Steve Hartman (Oak Ridge National Laboratory)

Core Developments

  • Steve Hartman (Oak Ridge National Laboratory)

Description

3.15, 7.0 and beyond

Presentation materials

There are no materials yet.

  1. Bruce Hill (SLAC)
    06/06/2019, 14:30
    Services
    Talk

    Will discuss status of PVAccess Gateway project and results of performance and stress tests at SLAC.

    Go to contribution page
  2. Sena Hounsinou (Howard University)
    06/06/2019, 14:50
    Core Developments
    Talk

    The typical EPICS system consists of three major categories of hardware asset classes: the local area network (LAN), the operator interfaces (OPI), and the Input/Output Controllers (IOCs) where scientific data such as process variable (PV) values, limits and metadata reside. Most institutions’ mission requires that the system be up and running over 95% of the time during service periods and...

    Go to contribution page
  3. Mr Michael Davidsaver (Osprey DCS)
    06/06/2019, 15:00
    Core Developments
    Talk

    Report on recent changes to EPICS Base and related modules.

    Go to contribution page
  4. Richard Farnsworth (Brookhaven National labs)
    06/06/2019, 15:20
    Miscellaneaous
    Talk

    Update on the always underestimated activities of the EPICS Council.
    An EPICS Python working group has been established.

    Go to contribution page
  5. Ralph Lange
    06/06/2019, 16:20
    Core Developments
    Talk

    EPICS uses a set of Continuous Integration (CI) tools to support the development of the Core package and support modules. An overview of the used tools and their scopes will be presented.

    A recent development tries to provide a common set of scripts for these CI services. This allows support modules to be automatically built and tested against multiple EPICS versions, on different OSs, using...

    Go to contribution page
Building timetable...