22–28 Jun 2019
DoubleTree at the Entrance to Universal Orlando
America/New_York timezone

5P29 - Triggered gas switches for use in capacitor-switch assemblies for LTD technology

28 Jun 2019, 13:30
1h 30m
DoubleTree at the Entrance to Universal Orlando

DoubleTree at the Entrance to Universal Orlando

5780 Major Blvd. Orlando, Florida, 32819, USA

Speakers

Ivan Lavrinovich (HCEI SB RAS) Denis Molchanov (IHCE SB RAS)

Description

Currently, active development of the element base for high-current generators is underway. The previously proposed and implemented new type Capacitor-Switch Assembly - HCEIcsa 160-0.1 required the development of new triggered gas switch. The design of the electrodes determines the largest possible operating voltage, the required pressure and jitter of the CSA, which ultimately affects the output parameters of the whole Ltd generator.
The report shows the test results of our new switches for such type of CSA. The design and calculations of electric fields are presented, experimental data on the dependence of the switching characteristics on the pressure in the spark gap and the parameters of the discharge circuit are given.

The work was supported by the Russian Science Foundation (project No. 17-79-20292)

Authors

Ivan Lavrinovich (HCEI SB RAS) Denis Molchanov (IHCE SB RAS) D. Rybka (Institute of High Current Electronics SB RAS, Tomsk, Russia) Mr Semen Vagaytsev (Institute of High Current Electronics) Aleksander Erfort (Institute of High Current Electronics)

Co-authors

Anton Artemov (Institute of High Current Electronics) Aleksander Lensky (Institute of High Current Electronics) Mr Alexander Zhigalin (Institute of High Current Electronics SB RAS)

Presentation materials

There are no materials yet.