3–7 Jun 2018
Jackson Lake Lodge
America/Denver timezone

Klystron Modulators for the FAIR pLINAC

5 Jun 2018, 13:30
1h 30m
Buffalo/Moose

Buffalo/Moose

Board: 2P51

Speaker

Mr Sven Pütz (GSI Helmholtz Centre for Heavy Ion Research)

Description

The FAIR accelerator chain comprises a 68 MeV proton injector (pLINAC). Seven identical high power RF systems can supply the RFQ, CCH and CH accelerating structures with up to 2.5 MW. The klystrons require a cathode voltage pulse of -115 kV, 54 A with a flat-top droop of less than 1% over 360 µs. A Klystron modulator has been developed at GSI to meet this demand and two prototype systems are currently under construction in-house.
The selected topology is a capacitor discharge type. A switch-mode current source charges a capacitor bank of 5.4 mF to a programmable voltage of nominally 3.8 kV. A solid state switch assembly generates the output pulse which is stepped up by a ratio 1:33 pulse transformer to the level required by the klystron. The moderate pulse width allows delivering satisfactory flat-top performance without the need for dedicated droop compensation circuitry.
Commissioning of the prototypes is anticipated for the end of 2018 with full availability for operation of the pLINAC RF Test Stand in 2019. Series production of additional seven units will follow.

Author

Mr Sven Pütz (GSI Helmholtz Centre for Heavy Ion Research)

Co-authors

Dr Alexander Schnase (GSI Helmholtz Centre for Heavy Ion Research) Dr Gerald Schreiber (GSI Helmholtz Centre for Heavy Ion Research)

Presentation materials

There are no materials yet.

Peer reviewing

Paper