Saclay/Mainz interface meeting 23/7/25
 
Clarified at the meeting or since:
- vacuum seal between chapeau and vacuum chamber : evacuate trapped air from sealing channel in the outer flange of the chapeau
 
- membrane flange : screws connecting air and vacuum -> replace by non-throughgoing screws
 
- nuts for the rails inside the vacuum chamber : non-magnetic material (titanium; polymer possible?) Ensure nut shape is correct before ordering.
 
- handling tools (small cranes, fenwicks): Saclay lists its requirements for the installation; MESA workshop will make them available
 
- beam tube extension
- any welding should be made non-magnetic (cf. beamtube flange). Use non-magnetic welding metal
 
- upstream end of beamtube extension : connection with accelerator handled by MESA
 
 
 
Still open issues:
- update MESA step file on seafile
 
- vacuum chamber : please provide manufacturing drawings (meeting between Boris and NTG next week)
 
- beam tube extension
- material : stainless steel? Aluminum? (-> activation)
 
- which magnetic permeability tolerance (<1.1?)
 
 
- percentage of antimony in shielding rings? check forward shielding rings (which use antimony too), and replicate.
 
- Chapeau integration:
- distance between chamber and wall?
 
- can the structure on the wall be dismounted?
 
- enlarge width between support structures near hall entrance, for access
 
 
- vacuum seal between chapeau and vacuum chamber : radiation hardness specifications?
 
 
 
             
            
                
                    There are minutes attached to this event.
                    